Ridges and Valleys prepped for scribing

Once the three valleys were cut together and positioned in space correctly, we could bring the ridges up, from underneath the valleys, to a location where we could scribe them together.  Because we are matching a system that has been … Continue reading

Share
Posted in Uncategorized | Comments Off

Common Valley shop setup

We are now fabricating the triple common valley system.  Set on “Old Glory”, the completed system will have 3 common valleys, 2 bastard valleys, 4 ridges, and myriad jack rafters.  As Old Glory and two of the ridges and the … Continue reading

Share
Posted in Uncategorized | Comments Off

Kitchen side Rafters installed

After copious checking and careful scribing, the rafters were taken down and cut, along with the eave wall plates and the ridge notches.  Once that was complete, we could fly all of the rafters back up, into space, and do … Continue reading

Share
Posted in Uncategorized | 1 Comment